West Midway Pedestrian Bridge

News & Updates ........................................................................................

The design is expected to continue into the fall of 2018. Construction is anticipated to be completed by spring of 2019, subject to change by Burlington Northern Santa Fe (BNSF) approval.  Geotechnical and survey field work has been completed.  Relocation of prairie dogs has been conducted.

Staff is coordinating with the BNSF Railroad for approval of the crossing and a construction and maintenance agreement.  30% plans will be submitted to BNSF in May 2018 as part of the BNSF approval process.  Staff met to discuss options for the trail crossing at Industrial Lane.  A project presentation was provided to Open Space and Trails Committee (OSTAC) in February 2018, and again in April 2018, providing information on the project design and details about the trail crossing at Industrial Lane.

Background Information

The Broomfield Trail - Railroad Bridge to Industrial Lane to Midway (BT2) project will construct a pedestrian bridge and trail connections from West Midway Boulevard to Industrial lane over the BNSF Railroad improving pedestrian and bike access to the US 36 Bikeway, Interlocken, and the Flatiron shopping district.  During the course of design additions to the scope have been requested by staff and Open Space and Trails Committee (OSTAC).  The additions include a signalized crossing at Industrial Lane and a 12-foot wide pedestrian bridge and trail.  

Before detailed design work for the bridge could begin, it was necessary to determine a conceptual alignment for the West Midway Boulevard Extension that will also cross the BNSF tracks.The goal for this project was to plan for the bridge so that if and when the road extension is built in the future, the bridge would not be impacted. At this time, the Midway project is not scheduled for a specific construction date. Click here to see the proposed conceptual alignment for the West Midway Boulevard Extension. Broomfield also needed to purchase a parcel of land from Hunter Douglas to allow for the bridge and future road right of way. Lastly, the money for this significant project needed to be set aside.  These tasks have now been completed. 

This project involves the construction a 2017-foot, nine-inch long and 12-foot wide pedestrian bridge over the BNSF railroad tracks. The bridge will be a dark brown color and is made of COR-TEN steel. A 900-foot trail connection from the intersection of Hoyt Street and W. Midway Blvd. will connect to the bridge. On the south side of the bridge, the trail will connect to Industrial Lane in the vicinity of the US 36 underpass. The Industrial Lane Crossing will include a Pedestrian Hybrid Beacon (PHB) or light that can be activated by bikers and pedestrians, rumble strips and signage to alert drivers to the crossing. If there are no pedestrians or cyclists that desire to cross Industrial Lane, the PHB light is not active and vehicular traffic passes freely. Click on the "PHB/HAWK Crossing" tab below to see how these work.

Signage

An interpretive sign will be provided to explain views and historical information related to the site.

Public Art

Public artwork is also part of the project. The sculpture is called, "Illuminate, and was created by David Farquharson. During the day, the piece is a subtle blue-gray. In the evening, the piece lights up in a variety of colors based on electromagnetic fields. Here is an image of the sculpture:

Midway Art Sculpture

Comments:

If you have questions or would like to comment on this project, please call Ed Thompson, Project Manager, at 303-438-6205, ethompson@broomfield.org.

  1. Project Plans & Drawings
  2. PHB/HAWK Crossing
  3. BNSF Railroad/Land Purchase
Website Midway Pedestrian Bridge At-Grade Rendering

 Walk Bike Broomfield projects graphic timeline_here arrow
   
Walk Bike Broomfield projects graphic timeline_timeline